INFRASTRUCTURE CONSTRUCTION PACKAGE - PHASE 1 OF BIEN HOA AIRPORT POLLUTION TREATMENT PROJECT


After the construction period of the USAID Second Interim Measures Project for Dioxin Remediation at Bien Hoa Airport Area (IM2), Vinccons E&C was honored to win the Infrastructure Construction Package - Phase 1 of the Bien Hoa Airport Area Pollution Remediation Project.

General Information:

Managing Unit Air Defense - Air Force, Ministry of National Defense
Funding Agency United States Agency for International Development (USAID)
Main Contractor Vina E&C Investment and Construction Joint Stock Company
Consultant/Supervisor Trigon Associates LLC
Item
USAID civil works to treat Dioxin in Bien Hoa Airport area
Construction time 2022 - hiện tại

Related projects

CONSTRUCTION & OPERATION PROJECT OF NHIEU LOC - THI NGHE WASTEWATER TREATMENT PLANT

This is a project that started in August 2023. Vina E&C is honored to be trusted by Acciona - Vinci Joint Venture (AVJ) as the DBO general contractor to implement package XL-02 of the Nhieu Loc - Thi Nghe Wastewater Treatment Plant Design, Construction and Operation Project. This is phase 2 of an important package and has the largest investment level currently in an environmental project in Ho Chi Minh City. The project includes the construction of a wastewater treatment plant with a treatment capacity of 450,000m3 to improve environmental sanitation and enhance public health.

Dioxin processing project at Bien Hoa Airport - IM2

Building long -term and temporary dioxin -contaminated land storage areas, constructing transport infrastructure, excavating and transporting contaminated soil, as well as installing waterproof HDPE lining.

HO CHI MINH CITY WASTEWATER TREATMENT PLANT PROJECT

Wastewater treatment plant expansion

DIOXIN TREATMENT PROJECT AT BIEN HOA AIRPORT – CW1

The Dioxin Remediation Project at Bien Hoa Airport – CW1 is part of a cooperation program between the Government of Vietnam and the United States to overcome the consequences of Agent Orange after the war. VINA E&C is honored to be the main contractor, responsible for the construction of the treatment area, transportation and treatment of more than 270,000 m³ of contaminated soil, ensuring compliance with international environmental and safety standards.

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA

Dioxin remediation at Bien Hoa airbase area

HCMC SECOND WATER ENVIRONMENT IMPROVEMENT PROJECT – PACKAGE J

Construction of concrete structure system