After the construction period of the USAID Second Interim Measures Project for Dioxin Remediation at Bien Hoa Airport Area (IM2), Vinccons E&C was honored to win the Infrastructure Construction Package - Phase 1 of the Bien Hoa Airport Area Pollution Remediation Project.
General Information:
Managing Unit | Air Defense - Air Force, Ministry of National Defense |
Funding Agency | United States Agency for International Development (USAID) |
Main Contractor | Vina E&C Investment and Construction Joint Stock Company |
Consultant/Supervisor | Trigon Associates LLC |
Item | USAID civil works to treat Dioxin in Bien Hoa Airport area |
Construction time | 2022 - hiện tại |
Construction + equipment installation
This is a project that started in August 2023. Vina E&C is honored to be trusted by Acciona - Vinci Joint Venture (AVJ) as the DBO general contractor to implement package XL-02 of the Nhieu Loc - Thi Nghe Wastewater Treatment Plant Design, Construction and Operation Project. This is phase 2 of an important package and has the largest investment level currently in an environmental project in Ho Chi Minh City. The project includes the construction of a wastewater treatment plant with a treatment capacity of 450,000m3 to improve environmental sanitation and enhance public health.
Building long -term and temporary dioxin -contaminated land storage areas, constructing transport infrastructure, excavating and transporting contaminated soil, as well as installing waterproof HDPE lining.
Wastewater treatment plant expansion
The Dioxin Remediation Project at Bien Hoa Airport – CW1 is part of a cooperation program between the Government of Vietnam and the United States to overcome the consequences of Agent Orange after the war. VINA E&C is honored to be the main contractor, responsible for the construction of the treatment area, transportation and treatment of more than 270,000 m³ of contaminated soil, ensuring compliance with international environmental and safety standards.
Dioxin remediation at Bien Hoa airbase area
Construction of concrete structure system